Track the time spent testing in Vansah using a Test Run’s timer and Work log. You can review automatically recorded time, add extra testing effort and correct individual entries.
How the Test Run timer works
The timer measures elapsed time while you execute a Test Case. Starting an execution can start the timer automatically. Simply opening an existing Test Run to view it does not start the timer.
Use the timer’s Start or Stop control when you need to manage the session yourself. Selecting Stop saves the elapsed time as a Work log entry.
When a running execution is completed, Vansah stops the timer and saves an entry marked AUTO. This can happen when the test steps reach 100% completion or the Test Run receives a final result, such as Passed, Failed or N/A.
Note: Logged time is stored in whole minutes. A timer session with elapsed time is rounded up to the next whole minute. For example, 1 minute and 20 seconds is logged as 2 minutes.
View a Test Run’s Work log
Open the required Test Run. If you are working in a Test Plan, select the relevant iteration and Test Run.
In Activity, select Work log.
Review Actual logged time and the entries underneath it. Use Refresh to reload the list when needed.
Each entry shows who logged the time, the duration and when it was logged. A description appears when one was added. The AUTO label identifies time saved automatically by Vansah.
Automatic and manual entries
Entry | When to use it |
Automatic (AUTO) | Time saved automatically from a running execution timer when execution finishes. |
Manual | Time saved when you stop the timer yourself, or add an entry using Log time. Use Log time for additional work such as investigation, verification or retesting. |
Avoid counting the same effort twice. Check existing entries before adding time manually. Actual logged time adds together the entries saved against that Test Run.
Add time manually
Open the Test Run and select Activity → Work log.
Select + Log time.
Enter Time spent in whole minutes. For example, enter 15 for fifteen minutes.
Optionally enter a Work description to explain the activity.
Select Save. The new entry is added to the Work log and included in Actual logged time.
Each entry must be between 1 and 14,400 minutes.
Correct or delete a time entry
In the Work log, find the entry you want to change:
Select Edit to change its time or description, then select Save.
Select Delete to remove an incorrect entry, then confirm the deletion.
The Actual logged time total updates after an entry is changed or deleted.
Estimated time and actual logged time
Estimated time is the planned effort set on the Test Case. Actual logged time is the effort recorded in the Test Run’s Work log. Adding or editing a Work log entry changes the actual time; it does not change the Test Case’s estimate.